No one indeed wants to have a sewage backup problem. You must have a sewage system if you have a bathroom in the basement or any plumbing fixtures that run through your home’s main sewer line. That will help pump against gravity to get rid of all the waste solids.
A sewage ejector pump excels at pumpkin slides and wastewater up and away from your home, but eventually, the best pump will need to be replaced. And, if you want to keep them away from your commercial or residential building, you have to install a sewage system.
But, if you don’t know how to install Sewage Pumping System, this will help you. We will give you complete information about how you can install a unique sewage system for your residential or commercial building.
Step by Step Guide, How to Install Sewage Pumping Station?
Choose a Suitable Location to Install Sewage Pumping Station
You should keep in mind that you should install a pumping station somewhere below ground level. Therefore, you should carefully think about the location. It is also vital to allot for falls in site drainage, and before you start to dig, you should check for the
underground pipes, services duts, and cables.
Excavate the Opening
The second step is to dig a hole for your pumping station. Thus, this should be approximately 500mm deeper than the overall length of the tank. If you dug it by hand, the sides would need to be shored up to prevent the earth slippage. But, if you take machines’ help in digging, they should be battened for stability. Whether you choose hand or machine, the dewatering pump may be necessary to drain away any groundwater.
Prepare the Excavation
The next step is to layer a pure hardcore in the excavation base. Its thickness should be 200mm, but if the ground conditions are reasonable, it can be above 50mm. Then, you have to cover the hardcore with a layer of concrete, consolidate and compact both.
Installation of the Tank
Now, you are ready for the installation. Slowly lower the tank of the packaged sewage pumping station onto the damp base and allow the feet to settle into the concrete. It is essential to ensure that the pipes and other connections are in their correct positions. If you find out that the inlet socket is less than 800mm from the tank’s base, you should correct that in this stage.
Secure the Tank in Place
Once you make all the positions correctly, fill the water tank and secure it using concrete. You should make sure that you pour this evenly around the periphery of the tank to eliminate the risk of any mistake. Then, connect all the pipes on the pump station and backfill with grade 25 concrete.
Make the Final Connections
The last step is the wiring. Give enough time for the concrete to settle down and remove all the water from the tank. You are now free to install the pump and float switches, check control panels, and make final connections.
In this way, you can yourself install the pump. But, here at our company, you will find professional and trained people that will help you with this process. So, if you want that, we will make a pumping station for you, and we are here to help.
A Quick Wrap Up!
To sum up all the discussion, we can say that all the steps mentioned above will help you build the station. But, if you ask for the help of professionals, then it would be much better Because we have the right people with the right equipment, who deliver you the best results in time. We guarantee you that we will provide you with long-lasting, reliable, and durable solutions. Once you make us install this pump, you don’t have to face any problems; our professionals will do their work correctly and with excellent efficiency. Moreover, JVC Wet Waste offer all of these services at very competitive rates so that anyone can hire us.